My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-03-09 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
06-03-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:11 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
6/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The associated construction estimate in today's dollars is approximately $1.08 million <br />and consists of 10% for contingencies. Add 12% for engineering and surveying and the <br />total estimate reaches $1.21 million. <br /> <br />3.2 Alternative 2A Remove Existing Storm Sewer Trunk Line and Replace with 5-year <br />Capacity Trunk Line <br /> <br />Alternative 2A is the replacement of the existing storm sewer trunk line between the <br />outfall channel and North Sycamore along the current storm sewer alignment. This <br />option is chosen as an alternative for the reduction in costs associated with pavement <br />repair and replacement that should offset the cost of pipe removal, traffic control and <br />extended construction time. The limits of the trunk line replacement are from the outfall <br />to North Sycamore. <br /> <br />This configuration has a design capacity of 225.0 (cfs) for a 5-year event at the outfall <br />and keeps the HGL below Fleetwood Drive throughout the limits of pipe replacement. <br />This is accomplished by the additional cover over the trunk in the border areas and can <br />easily be accomplished in Alternative 1. <br /> <br />The associated construction estimate is approximately $1.36 million and includes 10% <br />for contingencies. Add 12% for engineering and surveying and the total estimate reaches <br />$1.52 million. Increases in cost over Alternative 1 are due to replacing the entire storm <br />sewer with new pipe over leaving the pipe in use. <br /> <br />3-2 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.