My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-17-1992 Public Hearing and Regular Meeting of the Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1992
>
12-17-1992 Public Hearing and Regular Meeting of the Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:36 AM
Creation date
3/21/2025 2:53:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/17/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />• Page 2 of 4 <br />Planning & Zoning Commission <br />SCU93-001 <br />Analysis: Zoning Ordinance Section 7-700 establishes "Special Use <br />Performance Standards" which apply to Conditional Uses. <br />These standards, as they apply to this request, will be discussed <br />in this section of staffs report. The text of these standards is <br />too lengthy to be included in this report in full, but can be <br />found on Zoning Ordinance pages 63-64. <br />A. ~affic Control: <br /> <br />The proposed site, as noted, was formerly used as a <br />truck marshalling yard. With well over an acre of <br />surfaced area, there is adequate on site parking for both <br />employee's personal vehicles and concrete trucks. The <br />section of Strang Road which connects this site with <br />Hwy. 225 primarily serves industrial traffic; the <br />Southern Pacific rail yard and the trucking firms <br />referenced above. This facility should not have a <br />significant impact on the type or volume of traffic <br />utilizing Strang Road and the adjoining Section of Hwy. <br />225. <br />B. Drainage: <br />The site in question is already surfaced and graded. <br />Drainage modifications, should any be required, will be <br />addressed during the course of the certified site plan <br />review which takes place prior to issuance of any <br />building permit for new commercial or industrial <br />development. <br />C. Compatibility with Surrounding Area: <br />The tract in question is zoned for industrial use. It is <br />located in a somewhat isolated, secluded area (see <br />Exhibit A). This facility should not cause any <br />impairment to the value or use of the adjoining trucking <br />yards or the Southern Pacific rail yard. The location is <br />isolated enough to preclude impact on other properties. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.