My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-19-1997 Workshop Meeting, Regular Meeting, and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1997
>
06-19-1997 Workshop Meeting, Regular Meeting, and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:52:19 PM
Creation date
3/21/2025 2:54:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />Planning and Zoning Commission <br />Minutes of June 19, 1997 <br />Page 4 of 9 <br />utilities, covenants, etc. The red lined document was available for the Commission's <br />review and based on that document staff recommended Final Plat approval. <br />Chairman Waters asked Mr. Dill if the red lined document staff prepared was <br />acceptable to him He indicated it was acceptable to him. <br />John Armstrong stated that he had reviewed the covenants and restrictions and they <br />are acceptable as to form. However, ownership and maintenance of the detention <br />area by the homeowner's association is not addressed. Reference should be made in <br />the covenants. For the record, John Armstrong read from the red line of items as <br />follows: <br />A. Show covenants are in effect. <br />B. Show sidewalk requirement on the plat. <br />C. Show underground loop easements per 5/20/97 letter from H.L.& P. <br />D. Show street light easements per 6/10/97 letter from H.L.& P. <br />E. Show ownership and maintenance of the detention area by the homeowner's <br />association. <br />F. Show contour lines. <br />G. Show right -of -way width between points of curvature and tangency. <br />H. Show existing utility easement west of subdivision. <br />I. Show survey monument tie-in and three (3) control monuments. <br />J. Receive approval of covenants in form and content. <br />A motion was made by Dottie Kaminski to approve the Final Plat for Spencer <br />Landing, Section I with the following conditions: <br />1. The developer is required to pay for street lighting construction cost <br />and electrical service cost for one year. These monies will be <br />deposited with the City in an escrow account until such time as <br />construction/installation is complete. <br />2. The developer shall construct the proposed improvements in <br />accordance with the approved plans and specifications. <br />3. The developer shall file the approved covenants, conditions and <br />restrictions simultaneously with the recordation of the Final Plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.