Laserfiche WebLink
BID TABULATION #12006 - EAST MAIN STREET DRAINAGE IMPROVEMENTS <br />ITEM DESCRIPTION <br />UNIT <br />QTY <br />PASKEY INC <br />ANGEL <br />BROTHERS <br />MARCON <br />SERVICES <br />MATULA & MATULA <br />CONSTRUCTION <br />AR TURNKEE <br />CONSTRUCTION <br />TRIPLE B SERVICES <br />Section A <br />1. Mobilization <br />LS <br />1 <br />$9,000.00 <br />$14,000.00 <br />$74,437.00 <br />$23,520.00 <br />$30,000.00 <br />$20,000.00 <br />2. Site Restoration <br />LS <br />1 <br />$1,605.00 <br />$11,000.00 <br />$2,425.50 <br />$3,528.00 <br />$9,025.00 <br />$2,500.00 <br />3. Ditch regrading <br />LF <br />1450 <br />$3.07 <br />$4.00 <br />$8.70 <br />$5.70 <br />$2.50 <br />$20.00 <br />4. 18" RCP <br />LF <br />140 <br />$25.32 <br />$41.00 <br />$54.10 <br />$32.80 <br />$56.50 <br />$90.00 <br />5. 24" RCP <br />LF <br />127 <br />$29.96 <br />$64.00 <br />$56.10 <br />$43.90 <br />$65.00 <br />$100.00 <br />6. 48" RCP <br />LF <br />244 <br />$73.88 <br />$95.00 <br />$101.10 <br />$88.50 <br />$130.00 <br />$195.00 <br />7. 5'X 4' RCP <br />LF <br />285 <br />$179.24 <br />$180.00 <br />$197.30 <br />$189.50 <br />$292.50 <br />$280.00 <br />8. 6'X 4' RCP <br />LF <br />1216 <br />$196.38 <br />$203.00 <br />$210.50 <br />$204.30 <br />$360.00 <br />$325.00 <br />9. Type "E" Inlet <br />EA <br />1 <br />$3,219.70 <br />$2,600.00 <br />$3,524.40 <br />$2,820.00 <br />$3,800.00 <br />$5,500.00 <br />10. Type I Junction Box w /type "E" inlet top <br />EA <br />6 <br />$4,939.00 <br />$5,100.00 <br />$5,443.90 <br />$5,800.50 <br />$5,100.00 <br />$8,500.00 <br />11. Concrete Headwall @Outfall <br />EA <br />1 <br />$7,470.00 <br />$9,500.00 <br />$7,843.00 <br />$4,877.50 <br />$5,600.00 <br />$15,000.00 <br />12. Remove & Dispose of 15" X 30" RCP <br />LF <br />133 <br />$1.97 <br />$6.00 <br />$8.40 <br />$17.50 <br />$10.00 <br />$25.00 <br />13. Remove & Replace Asphalt Pavement per <br />Detail <br />SF <br />1300 <br />$4.59 <br />$7.50 <br />$9.70 <br />$8.00 <br />$4.00 <br />$22.50 <br />14. Remove & Replace Existing Asphalt Driveway <br />SF <br />220 <br />$4.59 <br />$7.50 <br />$6.60 <br />$8.00 <br />$4.00 <br />$45.00 <br />15. 2" PVC Waterline Offset <br />EA <br />1 <br />$1,139.00 <br />$350.00 <br />$522.60 <br />$834.80 <br />$1,050.00 <br />$4,000.00 <br />16. 3" PVC Waterline Offset <br />EA <br />1 <br />$1,368.00 <br />$500.00 <br />$550.10 <br />$852.50 <br />$1,050.00 <br />$4,100.00 <br />17. 6" PVC Waterline Offset <br />EA <br />2 <br />$2,845.00 <br />$1,300.00 <br />$1,442.40 <br />$1,869.70 <br />$1,100.00 <br />$4,500.00 <br />18. 8" PVC Waterline Offset <br />EA <br />2 <br />$3,295.00 <br />$1,500.00 <br />$1,442.40 <br />$2,104.90 <br />$1,150.00 <br />$5,000.00 <br />19. 2" pvc Sanitary Sewer Offset <br />EA <br />1 <br />$913.00 <br />$325.00 <br />$572.00 <br />$834.80 <br />$850.00 <br />$2,500.00 <br />20. Traffic Control <br />EA <br />1 <br />$1,717.00 <br />$1,500.00 <br />$1,650.00 <br />$4,656.30 <br />$4,000.00 <br />$10,000.00 <br />21. Hydro -Mulch Seeding <br />ACRE <br />1 <br />$1,288.00 <br />$1,500.00 <br />$1,100.00 <br />$1,802.60 <br />$2,000.00 <br />$1,500.00 <br />22. Concrete Rip -Rap @ Outfall (Bob's Gulley) <br />SY <br />100 <br />$40.30 <br />$51.00 <br />$42.00 <br />$53.90 <br />$40.00 <br />$60.00 <br />23. Storm water Pollution Prevention Measures <br />(BMP) <br />LS <br />1 <br />$707.00 <br />$4,700.00 <br />$1,870.00 <br />$5,292.00 <br />$2,500.00 <br />$10,000.00 <br />24. Wet Sand Construction <br />LF <br />500 <br />$0.33 <br />$0.10 <br />$1.10 <br />$21.70 <br />$10.00 <br />$20.00 <br />25. Well Pointing <br />LF <br />500 <br />99 <br />$0.10 <br />$1.10 <br />$33.60 <br />$10.00 <br />$20.00 <br />Sub Total Section "A° <br />E$4010978.93 <br />$440,569.00 <br />$517,587.40 <br />$481,760.80 <br />$689,017.50 <br />$790,455.00 <br />