BID TABULATION #12006 - EAST MAIN STREET DRAINAGE IMPROVEMENTS
<br />ITEM DESCRIPTION
<br />UNIT
<br />QTY
<br />PASKEY INC
<br />ANGEL
<br />BROTHERS
<br />MARCON
<br />SERVICES
<br />MATULA & MATULA
<br />CONSTRUCTION
<br />AR TURNKEE
<br />CONSTRUCTION
<br />TRIPLE B SERVICES
<br />Section A
<br />1. Mobilization
<br />LS
<br />1
<br />$9,000.00
<br />$14,000.00
<br />$74,437.00
<br />$23,520.00
<br />$30,000.00
<br />$20,000.00
<br />2. Site Restoration
<br />LS
<br />1
<br />$1,605.00
<br />$11,000.00
<br />$2,425.50
<br />$3,528.00
<br />$9,025.00
<br />$2,500.00
<br />3. Ditch regrading
<br />LF
<br />1450
<br />$3.07
<br />$4.00
<br />$8.70
<br />$5.70
<br />$2.50
<br />$20.00
<br />4. 18" RCP
<br />LF
<br />140
<br />$25.32
<br />$41.00
<br />$54.10
<br />$32.80
<br />$56.50
<br />$90.00
<br />5. 24" RCP
<br />LF
<br />127
<br />$29.96
<br />$64.00
<br />$56.10
<br />$43.90
<br />$65.00
<br />$100.00
<br />6. 48" RCP
<br />LF
<br />244
<br />$73.88
<br />$95.00
<br />$101.10
<br />$88.50
<br />$130.00
<br />$195.00
<br />7. 5'X 4' RCP
<br />LF
<br />285
<br />$179.24
<br />$180.00
<br />$197.30
<br />$189.50
<br />$292.50
<br />$280.00
<br />8. 6'X 4' RCP
<br />LF
<br />1216
<br />$196.38
<br />$203.00
<br />$210.50
<br />$204.30
<br />$360.00
<br />$325.00
<br />9. Type "E" Inlet
<br />EA
<br />1
<br />$3,219.70
<br />$2,600.00
<br />$3,524.40
<br />$2,820.00
<br />$3,800.00
<br />$5,500.00
<br />10. Type I Junction Box w /type "E" inlet top
<br />EA
<br />6
<br />$4,939.00
<br />$5,100.00
<br />$5,443.90
<br />$5,800.50
<br />$5,100.00
<br />$8,500.00
<br />11. Concrete Headwall @Outfall
<br />EA
<br />1
<br />$7,470.00
<br />$9,500.00
<br />$7,843.00
<br />$4,877.50
<br />$5,600.00
<br />$15,000.00
<br />12. Remove & Dispose of 15" X 30" RCP
<br />LF
<br />133
<br />$1.97
<br />$6.00
<br />$8.40
<br />$17.50
<br />$10.00
<br />$25.00
<br />13. Remove & Replace Asphalt Pavement per
<br />Detail
<br />SF
<br />1300
<br />$4.59
<br />$7.50
<br />$9.70
<br />$8.00
<br />$4.00
<br />$22.50
<br />14. Remove & Replace Existing Asphalt Driveway
<br />SF
<br />220
<br />$4.59
<br />$7.50
<br />$6.60
<br />$8.00
<br />$4.00
<br />$45.00
<br />15. 2" PVC Waterline Offset
<br />EA
<br />1
<br />$1,139.00
<br />$350.00
<br />$522.60
<br />$834.80
<br />$1,050.00
<br />$4,000.00
<br />16. 3" PVC Waterline Offset
<br />EA
<br />1
<br />$1,368.00
<br />$500.00
<br />$550.10
<br />$852.50
<br />$1,050.00
<br />$4,100.00
<br />17. 6" PVC Waterline Offset
<br />EA
<br />2
<br />$2,845.00
<br />$1,300.00
<br />$1,442.40
<br />$1,869.70
<br />$1,100.00
<br />$4,500.00
<br />18. 8" PVC Waterline Offset
<br />EA
<br />2
<br />$3,295.00
<br />$1,500.00
<br />$1,442.40
<br />$2,104.90
<br />$1,150.00
<br />$5,000.00
<br />19. 2" pvc Sanitary Sewer Offset
<br />EA
<br />1
<br />$913.00
<br />$325.00
<br />$572.00
<br />$834.80
<br />$850.00
<br />$2,500.00
<br />20. Traffic Control
<br />EA
<br />1
<br />$1,717.00
<br />$1,500.00
<br />$1,650.00
<br />$4,656.30
<br />$4,000.00
<br />$10,000.00
<br />21. Hydro -Mulch Seeding
<br />ACRE
<br />1
<br />$1,288.00
<br />$1,500.00
<br />$1,100.00
<br />$1,802.60
<br />$2,000.00
<br />$1,500.00
<br />22. Concrete Rip -Rap @ Outfall (Bob's Gulley)
<br />SY
<br />100
<br />$40.30
<br />$51.00
<br />$42.00
<br />$53.90
<br />$40.00
<br />$60.00
<br />23. Storm water Pollution Prevention Measures
<br />(BMP)
<br />LS
<br />1
<br />$707.00
<br />$4,700.00
<br />$1,870.00
<br />$5,292.00
<br />$2,500.00
<br />$10,000.00
<br />24. Wet Sand Construction
<br />LF
<br />500
<br />$0.33
<br />$0.10
<br />$1.10
<br />$21.70
<br />$10.00
<br />$20.00
<br />25. Well Pointing
<br />LF
<br />500
<br />99
<br />$0.10
<br />$1.10
<br />$33.60
<br />$10.00
<br />$20.00
<br />Sub Total Section "A°
<br />E$4010978.93
<br />$440,569.00
<br />$517,587.40
<br />$481,760.80
<br />$689,017.50
<br />$790,455.00
<br />
|