Laserfiche WebLink
ITEM DESCRIPTION <br />UNIT <br />QTY <br />PASKEY INC <br />ANGEL <br />BROTHERS <br />MARCON <br />SERVICES <br />MATULA & MATULA <br />CONSTRUCTION <br />AR TURNKEE <br />CONSTRUCTION <br />TRIPLE B SERVICES <br />Section B - Drainage Improvements (Alt) <br />1. Ditch regrading <br />LF <br />1170 <br />$3.07 <br />$14.50 <br />$8.70 <br />$5.70 <br />$2.50 <br />$20.00 <br />2. 24" RCP <br />LF <br />132 <br />$30.74 <br />$47.00 <br />$55.30 <br />$41.20 <br />$56.00 <br />$100.00 <br />3. 30" RCP <br />LF <br />211 <br />$38.45 <br />$61.00 <br />$66.40 <br />$53.20 <br />$65.00 <br />$115.00 <br />4. Remove & Dispose of 15" - 30" RCP <br />LF <br />297 <br />$1.97 <br />$6.00 <br />$8.40 <br />$35.80 <br />$10.00 <br />$25.00 <br />5. Remove & Replace Asphalt Pavement per Detail <br />SF <br />400 <br />$4.59 <br />$7.50 <br />$9.10 <br />$8.00 <br />$4.00 <br />$32.00 <br />6. Remove & Replace Existing Concrete Driveway <br />SF <br />600 <br />$6.33 <br />$10.50 <br />$7.70 <br />$8.50 <br />$8.00 <br />$20.00 <br />7. Remove & Replace Existing Gravel Driveway <br />SF <br />150 <br />$2.52 <br />$5.00 <br />$5.00 <br />$4.90 <br />$2.00 <br />$8.00 <br />8. Concrete Headwall <br />EA <br />2 <br />$739.00 <br />$800.00 <br />$7,800.00 <br />$6,081.53 <br />$5,600.00 <br />$3,150.00 <br />Sub Total Section "B" <br />$23,837.62 <br />$49,472.00 <br />$58,593.80 <br />$55,163.26 <br />$44,902.00 <br />$100,590.00 <br />Addendum No,1 <br />1. 2" G. V. w /Box <br />EA <br />1 <br />$17,820.00 <br />$15,000.00 <br />$10,364.40 <br />$27,235.50 <br />$22,000.00 <br />$60,000.00 <br />2. 3" G.V. w /Box <br />EA <br />2 <br />$418.00 <br />$500.00 <br />$430.20 <br />$187.20 <br />$650.00 <br />$1,100.00 <br />3. 6" G.V. w /Box <br />EA <br />2 <br />$500.50 <br />$600.00 <br />$485.20 <br />$487.10 <br />$750.00 <br />$1,300.00 <br />4. 8" G.V. w /Box <br />EA <br />4 <br />$693.00 <br />$800.00 <br />$1,117.70 <br />$834.00 <br />$950.00 <br />$1,600.00 <br />5. Cut in Prop. 2" Gate Valve to Existing Waterline <br />EA <br />4 <br />$870.00 <br />$1,150.00 <br />$1,337.70 <br />$1,072.70 <br />$1,450.00 <br />$1,900.00 <br />6. Cut in Prop. 3" Gate Valve to Existing Waterline <br />EA <br />2 <br />$485.90 <br />$400.00 <br />$347.70 <br />$936.00 <br />$1,250.00 <br />$500.00 <br />7. Cut in Prop. 6" Gate Valve to Existing Waterline <br />EA <br />2 <br />$636.80 <br />$500.00 <br />$347.70 <br />$936.00 <br />$1,450.00 <br />$525.00 <br />8. Cut in Prop. 8" Gate Valve to Existing Waterline <br />EA <br />4 <br />$1,724.80 <br />$800.00 <br />$347.70 <br />$5,463.60 <br />$2,040.00 <br />$575.00 <br />9. Dispose of Excess Spoil at Pete Gilliam Park <br />LS <br />4 <br />$1,724.80 <br />$900.00 <br />$347.70 <br />$6,051.60 <br />$2,450.00 <br />$650.00 <br />Sub Total Addendum No, 1! <br />$41,952.80 <br />$33,600.00 <br />$26,189.20 <br />$86,015.70 <br />$57,760.00 <br />$85,750.00 <br />A <br />Section "A "- Drainage Improvements <br />$401,978.93 <br />$440,569.00 <br />$517,587.40 <br />$481,760.80 <br />$689,017.50 <br />$790,455.00 <br />Section "B " - Drainage Improvements (Alt) <br />$23,837.62 <br />$49,472.00 <br />$58,593.80 <br />$55,163.26 <br />$44,902.00 <br />$100,590.00 <br />Addendum No. 1 <br />$41,952.80 <br />$33,600.00 <br />$26,189.20 <br />$86,015.70 <br />$57,760.00 <br />$85,750.00 <br />Grand Total <br />1 $467,769.351 <br />$523,641.00 <br />$602,370.40 <br />$622,939.76 <br />$791,679.50 <br />$976,795.00 <br />