ITEM DESCRIPTION
<br />UNIT
<br />QTY
<br />PASKEY INC
<br />ANGEL
<br />BROTHERS
<br />MARCON
<br />SERVICES
<br />MATULA & MATULA
<br />CONSTRUCTION
<br />AR TURNKEE
<br />CONSTRUCTION
<br />TRIPLE B SERVICES
<br />Section B - Drainage Improvements (Alt)
<br />1. Ditch regrading
<br />LF
<br />1170
<br />$3.07
<br />$14.50
<br />$8.70
<br />$5.70
<br />$2.50
<br />$20.00
<br />2. 24" RCP
<br />LF
<br />132
<br />$30.74
<br />$47.00
<br />$55.30
<br />$41.20
<br />$56.00
<br />$100.00
<br />3. 30" RCP
<br />LF
<br />211
<br />$38.45
<br />$61.00
<br />$66.40
<br />$53.20
<br />$65.00
<br />$115.00
<br />4. Remove & Dispose of 15" - 30" RCP
<br />LF
<br />297
<br />$1.97
<br />$6.00
<br />$8.40
<br />$35.80
<br />$10.00
<br />$25.00
<br />5. Remove & Replace Asphalt Pavement per Detail
<br />SF
<br />400
<br />$4.59
<br />$7.50
<br />$9.10
<br />$8.00
<br />$4.00
<br />$32.00
<br />6. Remove & Replace Existing Concrete Driveway
<br />SF
<br />600
<br />$6.33
<br />$10.50
<br />$7.70
<br />$8.50
<br />$8.00
<br />$20.00
<br />7. Remove & Replace Existing Gravel Driveway
<br />SF
<br />150
<br />$2.52
<br />$5.00
<br />$5.00
<br />$4.90
<br />$2.00
<br />$8.00
<br />8. Concrete Headwall
<br />EA
<br />2
<br />$739.00
<br />$800.00
<br />$7,800.00
<br />$6,081.53
<br />$5,600.00
<br />$3,150.00
<br />Sub Total Section "B"
<br />$23,837.62
<br />$49,472.00
<br />$58,593.80
<br />$55,163.26
<br />$44,902.00
<br />$100,590.00
<br />Addendum No,1
<br />1. 2" G. V. w /Box
<br />EA
<br />1
<br />$17,820.00
<br />$15,000.00
<br />$10,364.40
<br />$27,235.50
<br />$22,000.00
<br />$60,000.00
<br />2. 3" G.V. w /Box
<br />EA
<br />2
<br />$418.00
<br />$500.00
<br />$430.20
<br />$187.20
<br />$650.00
<br />$1,100.00
<br />3. 6" G.V. w /Box
<br />EA
<br />2
<br />$500.50
<br />$600.00
<br />$485.20
<br />$487.10
<br />$750.00
<br />$1,300.00
<br />4. 8" G.V. w /Box
<br />EA
<br />4
<br />$693.00
<br />$800.00
<br />$1,117.70
<br />$834.00
<br />$950.00
<br />$1,600.00
<br />5. Cut in Prop. 2" Gate Valve to Existing Waterline
<br />EA
<br />4
<br />$870.00
<br />$1,150.00
<br />$1,337.70
<br />$1,072.70
<br />$1,450.00
<br />$1,900.00
<br />6. Cut in Prop. 3" Gate Valve to Existing Waterline
<br />EA
<br />2
<br />$485.90
<br />$400.00
<br />$347.70
<br />$936.00
<br />$1,250.00
<br />$500.00
<br />7. Cut in Prop. 6" Gate Valve to Existing Waterline
<br />EA
<br />2
<br />$636.80
<br />$500.00
<br />$347.70
<br />$936.00
<br />$1,450.00
<br />$525.00
<br />8. Cut in Prop. 8" Gate Valve to Existing Waterline
<br />EA
<br />4
<br />$1,724.80
<br />$800.00
<br />$347.70
<br />$5,463.60
<br />$2,040.00
<br />$575.00
<br />9. Dispose of Excess Spoil at Pete Gilliam Park
<br />LS
<br />4
<br />$1,724.80
<br />$900.00
<br />$347.70
<br />$6,051.60
<br />$2,450.00
<br />$650.00
<br />Sub Total Addendum No, 1!
<br />$41,952.80
<br />$33,600.00
<br />$26,189.20
<br />$86,015.70
<br />$57,760.00
<br />$85,750.00
<br />A
<br />Section "A "- Drainage Improvements
<br />$401,978.93
<br />$440,569.00
<br />$517,587.40
<br />$481,760.80
<br />$689,017.50
<br />$790,455.00
<br />Section "B " - Drainage Improvements (Alt)
<br />$23,837.62
<br />$49,472.00
<br />$58,593.80
<br />$55,163.26
<br />$44,902.00
<br />$100,590.00
<br />Addendum No. 1
<br />$41,952.80
<br />$33,600.00
<br />$26,189.20
<br />$86,015.70
<br />$57,760.00
<br />$85,750.00
<br />Grand Total
<br />1 $467,769.351
<br />$523,641.00
<br />$602,370.40
<br />$622,939.76
<br />$791,679.50
<br />$976,795.00
<br />
|