My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-09-22
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2022 (2)
>
09-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:21:53 AM
Creation date
7/25/2025 3:33:50 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
9/12/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />Drainage Analysis Proposed Conditions <br />Mr. Lorenzo Wingate <br />City of La Porte <br />August 4, 2022 <br />Page 5 <br />a) Develop one (1) improvement alternative to reduce ponding in the neighborhood. Adjust the <br />InfoWorks ICM model to reflect the improvement alternative. The alternative will include <br />evaluation of mitigation to show no adverse impact downstream. Improvements may include: <br />a. Storm sewer replacement <br />b. Parallel storm sewer <br />c. Detention/mitigation <br />d. Channel improvements <br />e. Street re -grading <br />b) Simulate the improvement alternative for the 5-year, 10-year, and 100- year storm events to assess <br />the hydraulic effectiveness of the project. Review potential impacts and assess the 100 ac-ft <br />detention basin. Model the effects of connecting the east -west channel north of the project area to <br />B 109-00-00. Calculate the number of parcels/structures impacted, inundated areas, and middles of <br />roadway impacted. <br />c) Develop estimated construction costs for the alternative including a 30% contingency. <br />d) Preliminary civil design analysis including utility conflicts, constructability, and typical sections. <br />e) Present the proposed alternative and recommendation to the City. <br />Preliminary Engineering Report <br />a) Prepare draft preliminary engineering report including methodology, assumptions, results, and <br />recommendations. The report will include tables, exhibits, and appendices. The draft report will <br />be submitted to the City and HCFCD for review and comment. <br />b) Based on comments received on the draft report, revise and submit the final report to the City for <br />approval. Include any digital information such as GIS shapefiles and models. <br />c) Prepare presentation and attend Drainage Committee meeting to present findings and <br />recommendations. <br />Item 2: Optional Additional Proposed Conditions Analysis (if authorized) <br />a) Develop two (2) additional improvement alternatives to reduce ponding in the neighborhood. <br />Adjust the InfoWorks ICM model to reflect the improvement alternatives. Each alternative will <br />include evaluation of mitigation to show no adverse impact downstream. Improvements may <br />include: <br />a. Storm sewer replacement <br />b. Parallel storm sewer <br />c. Detention/mitigation <br />d. Channel improvements <br />e. Street re -grading <br />b) Simulate each improvement alternative for the 5-year, 10-year, and 100- year storm events to assess <br />the hydraulic effectiveness of the project. Review potential impacts and assess the 100 ac-ft <br />detention basin. Model the effects of connecting the east -west channel north of the project area to <br />B 109-00-00. <br />c) Develop estimated construction costs for each alternative including a 30% contingency. <br />d) Preliminary civil design analysis including utility conflicts, constructability, and typical sections. <br />Present the proposed alternatives and recommendations to the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.