My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-25-12 Special Called Planning and Zoning
LaPorte
>
.Agendas
>
Planning and Zoning Commission
>
2010's
>
2012
>
04-25-12 Special Called Planning and Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2012 3:53:48 PM
Creation date
7/25/2025 3:44:06 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4)Continue inter-departmental coordination between the Planning, <br /> <br />Engineering, and Parks and Recreation Departments to offer inspection <br />services and plans for enhancement/redevelopment of public facilities <br />servicing the community. Utilize these annual inspections to set priorities <br />for funding in the Capital Improvement Program. <br />GOAL 3: Provide for the long-term supply of water and reliable treatment <br />and distribution systems. <br /> <br />Actions and Initiatives <br />1)Plan accordingly to budget approximately $400,000 to $600,000 per year <br /> <br />to expand and/or upgradeimprove <br />infrastructure, plus additional funding as necessary to replace aging <br />infrastructure in-kind. <br />2)In conformance with the schedule and specifications set forth in the <br /> <br />Water Master Plan, construct the necessary water system improvements <br />as identified below: <br />a.2011: 12-inch water line on N. L. Avenue (Phase 1); <br /> <br />b.2012: 12-inch water line on N. L. Avenue (Phase 2); <br /> <br />c.2013: 12-inch water line on N. L. Avenue (Phase 3); <br /> <br />d.2014: 12-inch water line on Bandbridge Road, Somerton Drive, <br /> <br />Spencer Highway; and Venture Lane; <br />rd <br />e.2015: 8-inch water line on Airport Boulevard and on N. 3 Street.; <br /> <br />th <br />f.2016: 12-inch water line on N. 8 Street and W. Barbours Cut; and <br /> <br />g.2017: 12-inch water line on Lomax School Road. <br /> <br />3)In response to development proposals, coordinate with the private <br /> <br />sector to ensure the construction of the following water system <br />infrastructure improvements as identified in the Water Master Plan: <br />a.12-inch water line on N. Avenue P; and <br /> <br />b.12-inch water line on Bay Area Boulevard; and <br /> <br />c.b.12-inch water line on State Highway 225. <br /> <br />4)In conformance with the specifications set forth in the Water Master <br /> <br />Plan, improve booster pump capacity at the following locations: <br />th <br />a.Phase II: West 25 Street Water Plant prior to 14,885 water service <br /> <br />connections, estimated to occur around 2015; <br />b.a.Phase III: Hillridge Water Plant prior to 15,584 water service <br /> <br />connections, estimated to occur around 2020; <br />th <br />c.b.Phase IV: Fairmont/4 Street Water Plant, prior to 16,958 water <br /> <br />service connections, estimated to occur around 2040; <br />d.c.Phase V: Broadway Water Plant, prior to 18,182 water service <br /> <br />connections, estimated to occur around 2040; and <br />th <br />e.d.Beyond 2040 through build-out: S. 25 Street Water Plant and <br /> <br />Bandridge Water Plant. <br />5)In conformance with the specifications set forth in the Water Master <br /> <br />Plan, construct a new 700,000 gallon elevated storage tank prior to <br />18,500 water service connections that are estimated to occur by the Year <br />2041. <br />3.11 <br /> <br />Infrastructure and growth capacity <br />2.ŗŗ Adopted July 20, 2009 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.