Laserfiche WebLink
r • ~ • <br />• <br />SECTION II <br />CHARACTER AND EXTENT OF SERVICES <br />The Engineer shall render the following professional services <br />necessary for the development of the Project: <br />A. Special Studies and Reports Phase - Basic Services <br />1. Prepare engineering report setting forth recommenda- <br />tions for the following items. Furnish City with <br />15 copies of report. <br />a. Develop plan for ultimate abandonment of existing <br />College View MUD wastewater treatment facility. <br />b. Develop plan for interim solids handling (sludge) <br />at existing College View MUD wastewater treatment <br />• facility. <br />2. Prepare compliance schedule for College View MUD <br />wastewater treatment facility. <br />3. Prepare applications for amendments to existing TDWR <br />and NPDES (EPA) permits in conjunction with the pro- <br />posed expansion of the City's wastewater treatment <br />facility. <br />B. Preliminary Design Phase - Basic Services <br />1. Attend preliminary conference with the City regarding <br />the Project. <br />2. Perform preliminary engineering services in connection <br />with Project in sufficient detail to clearly <br />the problems involved and the alternate solutions <br />• available to the City, to include preliminary layouts, <br />sketches, and estimates of probable cost for the <br />Project, and to set forth clearly the Engineer's <br />recommendations. Prepare preliminary engineering <br />reports specifically for the following items. <br />a. Fairmont Parkway Relief Sanitary Sewer. Develop <br />trunk sewer sizes, alignment, and connections to <br />existing system(s) from the existing College View <br />• <br />-2- <br />~ ~S <br />