Laserfiche WebLink
• <br />Exhibit B <br />Page 2 <br />a. <br />b. <br />• d. <br />Pr <br />Contour Map <br />Base topographic map by others, supplement as required showing <br />existing site topography: <br />a. Property boundary <br />b. Delineation of existing drainage areas <br />Sectorized Fill Layout <br />Prepare drawing showing: <br />a. Fill sequence <br />b. All-weather roadways <br />c. Location of drainage structures <br />Site Development Details <br />Prepare drawings showing details of: <br />All-weather roadway construction <br />Drainage features, culverts, ditches <br />Monitoring wells (water and gas) <br />Methane control <br />pical Fill Cross-Sections <br />epare cross-sectional drawings showing: <br />a. Existing grade _ , <br />b. Final grade <br />c. Limits of excavation <br />Ground and Surf ace Water Protection Facilities <br />Develop design and show alignment and cross-section of all required <br />drainage facilities. <br />L andf i 11 Completion P 1 an <br />Prepare drawing showing final contours. <br />Legal Description <br />Legal description of the site furnished by City, supplement as <br />required. <br />• Soils Report <br />Coordinate the preparation of soil investigation report (to be <br />prepared by Geotechnical Engineers). <br />