My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994-06-13 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1994
>
1994-06-13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:50:25 AM
Creation date
7/31/2025 10:48:19 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/13/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LA PORTE BID TABULATION <br />EMERGENCY SANITARY SEWER REPAIR <br />FAIRMONT PARK — HCFCD LINE REPLACEMENT & FARRINGTON POINT REPAIR <br />C NTRACTOR <br />BASE BID A <br />BASE BID B 11 <br />TOTAL BASE BID <br />ALTERNATE <br />TOTAL BID <br />FURLOW S VIC INC. <br />.00 � <br />I S31jQQ. oll <br />$1 .00 <br />32 500. <br />H2O SERVICES INC. <br />$27,625.W <br />9 000.00 <br />$36,625.00 <br />2 324.00 <br />38 949.00 <br />[PAS —K CONSTRUCTION INC <br />IR L UTILITIES INC. <br />11 FORCE CORPORATION <br />$47. <br />400.00 <br />M.672.001 <br />9.382.9011 <br />1 $22-000.00 <br />16 961.00 <br />64 871.31 11 <br />74 400.00FINCLUDgQ <br />48 633.00 <br />INCLUDED <br />$6,259.0011 <br />64 871.31 <br />$74 400.00 <br />$54,892.00 <br /># DISCOUNTED TOTAL IF BOTH REPAIRS ARE MADE <br />BID A — REPLACEMENT OF 680 FT 6` SANITARY SEWER <br />• BID B — POINT REPAIR OF 8" SANITARY SEWER <br />ALTERNATE — ADDITIONAL CONCRETE STREET REPLACEMENT — BID A <br />
The URL can be used to link to this page
Your browser does not support the video tag.