My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1996-05-06 Special Called Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1996
>
1996-05-06 Special Called Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:06 PM
Creation date
7/31/2025 10:49:42 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />• <br />City of I.a Porte <br />Page Z <br />Task 3: Review of Network Design <br />The network design will be reviewed with the City. A workshop will be conducted with your staff and <br />the MIS Steering Committee to discuss the design and identify any changes. The changes will be made <br />and the design will be used to develop the "Network Plan". <br />Professional Hours: 24 <br />Task 4: Develop Network Plan <br />During this task, our consultants will develop a network (communications) plan for the City. This Plan <br />will make specific recommendations concerning: <br />^ Any conversion issues (i.e. from one word processing system to another) <br />^ E-Mail and scheduling products <br />^ InterNet Access and Security <br />^ DOS to Windows conversion <br />^ Estimated costs <br />^ Server configurations based upon current technology (and recommendations for the <br />future -- based upon technology trends) <br />^ Support issues (network and product) <br />^ Use of lease lines, fiber optics, FrameRelay, Tl, ISDN, etc. for connectivity of "all <br />appropriate" City users. <br />Once the Plan is developed, a "Rough" draft will be presented and discussed with the MIS Steering <br />Committee and City Management. Identified changes will be made prior to the Plan being fmalized. <br />Professional Hours: 56 <br />Task 5: Planning for Two New Systems: Parks & Recreation and Fleet <br />Maintenance <br />During Task 5, our consultants will meet with the representitives of both areas. Discussions will be <br />conducted to determine information system needs and various product availability. A brief action plan <br />will be developed. The "Plan" will contain a statement of needs, potential systems, and estimated costs <br />for acquisition and implementation. The "Plan" will be presented to the MIS Steering Committee <br />during the same workshop contained within Task 4. <br />Professional Hours: 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.