My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004-11-08 Regular Meeting, Public Hearing and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2004
>
2004-11-08 Regular Meeting, Public Hearing and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:20 PM
Creation date
7/31/2025 11:02:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/8/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.2.5 In the case of an inconsistency, conflict or discrepancy between a reference standard <br />and the specifications, or with another reference standard, the contractor is deemed to have <br />included the more stringent requirements in the Bid. Clarifications of the inconsistency, <br />conflict or discrepancy will be accomplished as described in Subparagraph 1.2.4. <br /> <br />Add the following Subparagraph 1.6.2 to Paragraph 1.6 <br /> <br />1.6.2 Contractor's Use ofInstruments of Service in Electronic Form. <br /> <br />1.6.2.1 The Architect may, with the concurrence of the Owner, furnish to the Contractor <br />versions of Instruments of Service in electronic form. The Contract Documents executed or <br />identified in accordance with Subparagraph 1.5.1 shall prevail in case of any inconsistency <br />with subsequent versions made through manipulatable electronic operations involving <br />computers. <br /> <br />1.6.2.2 The Contractor shall not transfer or reuse Instruments of Service in electronic or <br />machine readable form without the prior written consent of the Architect. <br /> <br />ARTICLE 2 - OWNER <br /> <br />2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER <br /> <br />Delete Subparagraph 2.2.5 in its entirety and replace it with the following: <br /> <br />2.2.5 The Contractor will be furnished free of charge 25 copies of Drawings and Project <br />Manuals. Additional sets will be furnished at the cost of reproduction, postage, handling and <br />delivery. <br /> <br />Add Subparagraph 2.2.6 <br /> <br />2.3 OWNER'S RIGHT TO STOP THE WORK <br /> <br />At Subparagraph 2.3.1, Add Clause 2.3.1.1: <br /> <br />.1 Any delay resulting from such work stoppage shall not extend any Milestone Date <br />identified in the Contract for Construction or the required dates of Substantial or <br />Final Completion. <br /> <br />2.4 OWNER'S RIGHT TO CARRY OUT THE WORK <br /> <br />Delete Subparagraph 2.4.1 in its entire~v and replace it with the following: <br /> <br />2.4.1 If the Contractor defaults or neglects to carry out the work in accordance with the <br />Contract Documents and fails within seven (7) calendar days after receipt of written notice <br />from the Owner to commence and continue correction for such default or neglect with <br /> <br />':\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.