Laserfiche WebLink
<br />k lot z .~. ass 0 cia t e s <br /> <br />Mr. Ron Bottoms <br />September 3, 2009 <br />Page 3 of5 <br /> <br />6. Develop XP-SWMM models for proposed storm sewer system and proposed <br />overland sheet flow patterns. Adjust models to optimize proposed size of storm <br />sewer system and overland sheet flow system along Fleetwood Drive. <br />7. Compare proposed and existing conditions and identify impacts. <br />8. Quantify amount of mitigation necessary to offset impacts. <br />9. Develop proposed roadway profile. <br />10. Research existing utilities and identify potential utility conflicts using survey and <br />available data provided by the City. <br />11. Analyze mitigation elements. <br />12. Determine if any right of way will need to be acquired. <br />13. Perform a constructability review and identify any critical elements. <br />14. Identify potential environmental issues. <br />15. Prepare a preliminary construction cost estimate. <br />16. Prepare draft PER. <br />17. Perform internal QA/QC and address comments. <br />18. Meet with City to submit and discuss PER. City review time is estimated between <br />two (2) and four (4) weeks. <br />19. Prepare impact analysis report for HCFCD submittal, include write up, exhibits and <br />tables. <br />20. Perform internal QA/QC and address comments. <br />21. Meet with HCFCD to submit and discuss impact analysis report. HCFCD review <br />period is estimated between two (2) and four (4) weeks. <br />22. Address comments from City and HCFCD, if any. <br />23. Submit final PER to City. <br />24. Submit final impact analysis report to HCFCD. <br /> <br />C. Deliverables: <br />25. Copies of correspondence from HCFCD. <br />26. Originals of signed and sealed impact analysis for City and HCFCD. <br />27. Electronic copies in PDF format of report, models and calculations on Compact <br />Disks (CDs). <br /> <br />TERMS <br /> <br />Specific items excluded from this proposal are Conditional Letter of Map Revision (CLOMR), <br />CLOMR based on Fill (CLOMR-F) or other submittals to FEMA. Any environmental <br />assessment or study is also excluded from this proposal. These services are considered <br />additional services and may be performed by Klotz Associates for an additional fee. <br />