My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-2-22
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-2-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:24 PM
Creation date
7/31/2025 11:14:17 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'WtnDeWzele . <br /> <br />Engineering <br />Incorporated <br />2925 Briarpark, Suite 275 <br />Houston, 1)( 77042-3720 <br />7131782-0042 Fax 7131782-5337 <br /> <br />January 21,2010 <br />(Revised February 10, 2010) <br /> <br />Mr. Steve Gillett <br />Director of Public Works <br />City of La Porte <br />2963 North 23rd. Street <br />La Porte, Texas 77571 <br /> <br />Attn.: Mr. Don Pennell <br /> <br />Re: Sanitary Trunk Sewer Extension Project <br />V&V Project No. 20009-802-1-UTL <br /> <br />Dear Mr. Gillett: <br /> <br />VanDe Wiele & Vogler, Inc. (V & V) is pleased to submit this proposal to provide <br />professional engineering and related services to the City of La Porte (City) for the <br />Construction Phase of the captioned project. The Basic Services associated with this <br />phase include, but are not limited to: <br /> <br />a. Attend and assist City in pre-construction conference; <br /> <br />b. Review contractor-furnished submittals, shop drawings and working drawings for <br />compliance with the design concepts and specifications. Maintain project's <br />submittal log; <br /> <br />c. Review laboratory and mill tests of material and equipment and report to the City <br />any deficiencies noted; <br /> <br />d. Attend monthly construction progress and other issue-specific, called meetings <br />requested by the City. Prepare written minutes of the decisions, action items, etc. <br />and submit same to the City within 5 business days; <br /> <br />e. Make multiple and random site visits (versus the continuous services of a resident <br />project representative) to observe the Work's progress and quality (including <br />implementation of the traffic control and storm water pollution prevention plans), <br />to determine whether the Contractor is proceeding in accordance with the project <br />schedule and the design intent of the Contract Documents. Prepare and distribute <br />a status report of these observations and submit same to the City within 5 business <br />days; <br /> <br />Texas Professional Engineering <br />Firm Registration No.: F148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.