My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-21-1998 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
.Minutes
>
Planning & Zoning Commission
>
1990's
>
1998
>
05-21-1998 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:35 AM
Creation date
7/31/2025 11:28:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
5/21/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fairmont Park East, S. preliminary Plat <br />6/18/98 - P & Z Meeting <br />Page 2 of 3 <br />Analysis: Staffwould note that Section 5.02 of the Development Ordinance empowers <br />the Commission to require pedestrian sidewalks when it feels their inclusion <br />will serve the public interest. Staffrecommends the inclusion of sidewalks <br />within the Fairmont Park East Subdivision. Responsibility for construction <br />of the walks should be specified by covenant as well as stated in writing on <br />the front of the final plat document for each section. <br />For general information purposes, staff has listed items below that need to be <br />addressed by the developer with the submittal of the final plat. <br />• A reference that the detention pond ownership and maintenance by the <br />Homeowner's Association shall be stated in writing on the final plat. <br />Language in the convenants and on the face of the plat shall <br />dedicateJtransfer ownership of the detention reserve to the Homeowners <br />Association. <br />• A reference that the developer is responsible for construction and <br />installation of sidewalks within the subdivision should be stated in <br />writing on the front of the final plat. (If sidewalks are required by the <br />Planning &Zoning Commission) <br />• A HL&P street light layout plan and letter stating costs from HL&P is <br />provided for review by the City. <br />• Payment for street lighting cost should be made to the City. <br />• Approval from the franchise utilities regarding the size and location of <br />the proposed utility easements are provided for City review and <br />approval. <br />• Payment to the City for street sign installation costs. Sign locations and <br />costs shall be determined by the City's Public Works Department. <br />• On Section VI, a payment of $14,350.00 is due the City in lieu of <br />parkland dedication. This figure is based on a $175.00 per dwelling unit <br />basis. The money will be placed in an escrow account and will only be <br />used for the acquisition or improvements of public park land or facilities <br />located in Park Zone 6, the zone in which Fairmont Park East is located. <br />• Subdivision covenants/deed restrictions for Section VI are provided to <br />the City for review and approval. <br />• Subdivision construction plan review is completed by the City and any <br />changes are made prior to the submittal of the final plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.