My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1969-07-07 Regular Meeting
LaPorte
>
City Meetings
>
Minutes
>
City Council
>
1960's
>
1969
>
1969-07-07 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:48 PM
Creation date
6/23/2006 8:03:20 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/7/1969
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />H. CARLOS SMITH, P.E. <br />CONSULTING ENGINEER <br />715 W. MntN Sr. <br />P. O. Box 375 <br />LA PORTE, TEXAS 77571 <br />7 July, 1969 <br />PHONE A/C 713 471-4194 <br />• <br />• <br />~~on. T~ayor H. F. Pfeiffer <br />City of La Porte <br />F. 0. Box 1115 <br />La Porte, Texas 77571 <br />Dear Tayor Pfeiffer: <br />I would like to take this opportunity to remind the <br />City of La Forte of the approaching deadline on <br />the one year general warranty of the construction <br />of the paving by both Gulf Bitulithic Company and <br />tiest Construction Co., on the street paving and <br />drainage project and the Library and Civic Center <br />paving project. <br />The Gulf Bitulithic Company project was accepted <br />by Ordinance r1o. 804 on October 9,.1968, and the <br />4~est Construction Co., project was accepted by <br />Council action on the same date. <br />In driving along some of the streets constructed <br />by Gulf Bitulithic Co., I h~.ve noticed some failures <br />particularly in the asphalt paving, and have been <br />informed that there are some failures in the Civic <br />Center parking area. <br />I would recommend that the City have an inspection <br />made of both of these jobs, and a report written to <br />outline the necessary repairs. The City should then <br />notify both of the contractors of the report and <br />repairs necessary, in writing, and request them to <br />correct their respective jobs under the terms of <br />their contracts and the one year general :warranty. <br />I would recommend that this work be accomplished as <br />soon as possible to take advantage of the dry <br />summer weather. <br />Very truly yours, ~ <br />~~ <br />H. Carlos Smith, P.B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.